Covert


Building Systems - Covert

Covert Energy Facility

For this Combined Cycle Power Facility located in Covert, Michigan, Blaine Construction provided and installed the primary and secondary building frame, all cladding, the general mechanical and  electrical system, the fire protection system, and the Plant Services Building architectural finishes for this design/build project.

The largest of the two buildings is the STG/CTG Turbine Building, which is 104,200 SF. The Turbine Building houses four gas turbines and two steam turbines along with two 80 ton overhead maintenance cranes. Along with the turbine building, Blaine supplied an Administration and Control building (14,263 SF) which houses the control center and personnel that run the facility as well as a warehouse/shop area that houses the on site maintenance staff, fabrication area, and spare parts.

2012 © BLAINE CONSTRUCTION CORPORATION. All Rights Reserved.
6510 Deane Hill Drive
Knoxville, TN 37919
TELEPHONE (865) 693-8900
FAX (865) 693-7894
Contact Us

  • Site Map

  • Web Design by In10sity