TDOT
This headquarter facility is constructed in a campus type configuration with 12 buildings spreading over 35 acres and was completed in 20 months.
The project incorporates several types of construction including precast concrete, wall panels, conventional structural steel, arched steel panels, and pre-engineered building systems. Included in BLAINE’s scope of work was all site utilities and asphalt paving.