McNeilus Steel Phases I & II
Morristown, TN
Phase I: This CM project involved the construction of a 90,000 SF design/build pre-engineered metal building manufacturing plant, including 4,500 SF of office space, on a two-acre site. The project included site work, utilities, sidewalks, parking, and loading dock areas.
Phase II: This CM project involved the construction of a 95,000 SF design/build pre-engineered metal building addition to the existing manufacturing plant. The project included the construction of a new site loop road and stormwater detention pond.
The Morristown McNeilus Steel plant fabricates metal parts for local OEMs in the Southeast.